Skip Navigation LinksIEC Home \\ ARIR Home \\ Documents by Waste Area Group (WAG)
Documents by Waste Area Group (WAG)
Keywords
Waste Area Group (WAG)

View:
Results In:
Records Returned: 5827
DetailsDoc IDTitleRev.Doc TypeDateWAG
DOE/ID-12086 IDAHO CERCLA DISPOSAL FACILITY (ICDF) CELL 3 EXPANSION PROJECT REMEDIAL DESIGN/CONSTRUCTION WORK PLAN FOR CELL 3 AND EVAPORATION PONDS (FINAL) 1NOT SPECIFIED10/1/20253
DOE/ID-12156 PFAS ASSESSMENT REPORT: IDAHO CLEANUP PROJECT FACILITIES—WAG 1, WAG 3, AND WAG 70NOT SPECIFIED9/11/20251, 3, 7
DOE/ID-12139 ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 20250NOT SPECIFIED9/2/20252
DOE/ID-12133 CENTRAL FACILITIES AREA LANDFILLS I, II, AND III ANNUAL MONITORING REPORT—FISCAL YEAR 20240NOT SPECIFIED9/2/20254
DOE/ID-12146 ACTION MEMORANDUM FOR THE NAVAL REACTORS FACILITY S5G FINAL END STATE INCLUDING DISPOSITION OF REACTOR VESSEL 0DOE CORRESPONDENCE8/5/20258, 102, 114
DOE/ID-12100 EXPLANATION OF SIGNIFICANT DIFFERENCES FOR OPERABLE UNITS 10-04, 4-13, 5-12, AND 1-10 RECORDS OF DECISION FOR THE EXPANSION OF PUBLIC HUNTING BOUNDARIES AT THE IDAHO NATIONAL LABORATORY SITE0ESD (EXPLANATION OF SIGNIFICANT DIFFERENCES)7/14/20251, 4, 5, 10
DOE/ID-12109 EXPLANATION OF SIGNIFICANT DIFFERENCES FACTSHEET FOR OPERABLE UNIT 10-08 RECORD OF DECISION FOR SITE-WIDE GROUNDWATER, MISCELLANEOUS SITES, AND FUTURE SITES: SITE EVALUATIONS USING THE OU 10-08 NEW SITE IDENTIFICATION PROCESS THAT RESULTED IN NO FURTHER ACTION WITH INSTITUTIONAL CONTROLS OR NO ACTION FROM FISCAL YEARS 2020 THROUGH 20240ESD (EXPLANATION OF SIGNIFICANT DIFFERENCES)6/30/20251, 3, 9, 10
RPT-2234 REV 0 INL SITE-WIDE INSTITUTIONAL-CONTROLS AND OPERATIONS-AND-MAINTENANCE ANNUAL REPORT—FY 20240DOE CORRESPONDENCE5/19/20251, 2, 3, 4, 5, 6, 7, 9, 10
DOE/ID-11492 FIELD SAMPLING PLAN FOR OPERABLE UNIT 7-13/14 AQUIFER MONITORING4NOT SPECIFIED5/12/20257
DOE/ID-12131 ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 20240NOT SPECIFIED4/8/20251
NSI-26007 FEDERAL FACILITY AGREEMENT AND CONSENT ORDER (FFA/CO) NEW SITE IDENTIFICATION (NSI) ANL-67 – BUILDINGS MFC-767 AND -795 PART A AND B0NEW SITE IDENTIFICATION4/8/20259, 10
EDF-11637 UPDATED RADIOLOGICAL HUMAN HEALTH RISK ASSESSMENT FOR EBR-II0NOT SPECIFIED4/1/20259, 10
EDF-11654 UPDATED INL RADIONUCLIDE PRELIMINARY REMEDIATION GOALS (PRGS) USING NEW INL SITE SPECIFIC FOOD INGESTION RATES0NOT SPECIFIED3/19/20251, 2, 3, 4, 5, 6, 7, 9, 10, 113, 114, 119
DOE/ID-12096 ANNUAL REPORT FOR THE FINAL GROUNDWATER REMEDIATION, TEST AREA NORTH, OPERABLE UNIT 1-07B, FISCAL YEAR 20230NOT SPECIFIED1/23/20251
DOE/ID-12102 ANNUAL GROUNDWATER MONITORING STATUS REPORT FOR WASTE AREA GROUP 2 FOR FISCAL YEAR 20240DOE CORRESPONDENCE1/22/20252
DOE/ID-12101 CENTRAL FACILITIES AREA LANDFILLS I, II, AND III ANNUAL MONITORING REPORT— FISCAL YEAR 20230DOE CORRESPONDENCE1/22/20254
NTCRA-24-001 NRF-608 DECOMMISSIONING AND DEMOLITION0NOT SPECIFIED1/21/20258, 102, 114
DOE/ID-11393 OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE PLAN4NOT SPECIFIED1/20/20257
DOE/ID-12110 FIELD SAMPLING PLAN FOR CERCLA SITE BORAX-10 AT THE BOILING-WATER REACTOR EXPERIMENT SITE0NOT SPECIFIED12/12/202410
CCN-333586 FORMAL RESPONSE SUPPORTING ALTERNATIVE 4 FOR THE S5G PROTOTYPE FACILITY FINAL END STATE0NOT SPECIFIED11/26/20248, 102, 114
DOE/ID-11518 INL COMMUNITY INVOLVEMENT PLAN1DOE CORRESPONDENCE11/26/20241, 2, 3, 4, 5, 6, 7, 9, 10
RPT-2228 REV 0 FISCAL YEAR 2024 ANNUAL LETTER REPORT FOR OPERABLE UNIT 7-13/14 OPERATIONS AND MAINTENANCE0NOT SPECIFIED11/12/20247
DOE/ID-12081 ENGINEERING EVALUATION/COST ANALYSIS FOR THE NAVAL REACTORS FACILITY S5G FINAL END STATE INCLUDING DISPOSITION OF REACTOR VESSEL0POST ROD REMOVAL ACTION10/15/20248, 102, 114
LST-1213 REMOVAL ACTIONS APPROVED UNDER THE ACTION MEMORANDUM FOR GENERAL DECOMMISSIONING ACTIVITIES UNDER THE IDAHO CLEANUP PROJECT6POST ROD REMOVAL ACTION10/9/20241, 2, 3, 7, 8, 10, 102, 114
M-1920 WHITE PAPER RECLAMATION OF ABRASIVE BLASTING MEDIA IN SUPPORT OF PCB PAINT REMOVAL TO SUPPORT SCRAP METAL RECYCLING00POST ROD REMOVAL ACTION10/9/20248, 102, 114
Page 
Page 1 of 234
Results Per Page